Project gallery

Our Work

Real projects from around the Inland Empire — residential and commercial exteriors, cabinet refinishing, epoxy floor coatings, and tile from tear-out through grout.

Before & after

Painting

Exteriors and cabinets are where prep shows up most. These are the same surfaces, washed, repaired and refinished.

Stucco home before exterior repaintBefore
Stucco home after exterior repaint in white with tan trimAfter
Full Exterior RepaintSingle-story stucco home washed, prepped and repainted, with trim, fascia and garage doors finished to match.
Multi-tenant retail center before exterior repaintBefore
Multi-tenant retail center after exterior repaint in charcoal and grayAfter
Retail Center Exterior RepaintMulti-tenant retail center taken from faded tan to a modern charcoal and gray scheme — prepped, masked and painted around business hours.
Kitchen with dated wood cabinets before repaintBefore
Kitchen after cabinet repaint with white uppers and black lowersAfter
Kitchen Cabinet RepaintDated wood cabinets degreased, sanded, primed and finished in a durable two-tone white and black.
Cabinet Repaint — Cabinets refinished in a soft blue-green over a hand-sanded, primed surface.
Cabinet RepaintCabinets refinished in a soft blue-green over a hand-sanded, primed surface.

Before & after

Epoxy floors

Flake, solid-color and hand-worked metallic systems — every one over concrete that was ground and repaired first.

Shower pan before metallic epoxy coatingBefore
Shower pan finished in copper metallic epoxyAfter
Metallic Epoxy Shower PanBare shower pan skim-coated and finished in a seamless copper metallic epoxy — no grout lines to fail.
Blue Flake Garage — Full-broadcast flake system with a high-gloss clear coat over a ground slab.
Blue Flake GarageFull-broadcast flake system with a high-gloss clear coat over a ground slab.
Black & White Flake — Two-car garage in a black, white and gray flake blend — hides dust and tire marks.
Black & White FlakeTwo-car garage in a black, white and gray flake blend — hides dust and tire marks.
Gray Flake Garage — Neutral gray flake with a satin top coat, cove and step edge finished.
Gray Flake GarageNeutral gray flake with a satin top coat, cove and step edge finished.
Solid Gray Epoxy — Clean single-color floor with a semi-gloss finish for a workshop garage.
Solid Gray EpoxyClean single-color floor with a semi-gloss finish for a workshop garage.
Silver Metallic — Hand-worked metallic epoxy with a marbled silver and charcoal pattern.
Silver MetallicHand-worked metallic epoxy with a marbled silver and charcoal pattern.
Metallic Garage Floor — Metallic system across a full two-car garage — a showroom look that still takes hot tires.
Metallic Garage FloorMetallic system across a full two-car garage — a showroom look that still takes hot tires.
Copper Metallic Basement — Copper and black metallic epoxy poured across a finished basement floor.
Copper Metallic BasementCopper and black metallic epoxy poured across a finished basement floor.

Tile & bath

Showers, floors and the parts you don't see

Finished tile work, plus the tear-out and waterproofing stages that decide whether it lasts.

Walk-In Shower — Large-format wall tile with a split-stone pebble floor, built-in bench, recessed niche and a linear drain.
Walk-In ShowerLarge-format wall tile with a split-stone pebble floor, built-in bench, recessed niche and a linear drain.
Same Shower, Looking Up — Rain head and handheld valve set into the wall tile, with the niche trimmed in matching pebble.
Same Shower, Looking UpRain head and handheld valve set into the wall tile, with the niche trimmed in matching pebble.
Bathroom Remodel — Floor-to-ceiling patterned wall tile with a frameless glass corner shower and marble-look floor tile.
Bathroom RemodelFloor-to-ceiling patterned wall tile with a frameless glass corner shower and marble-look floor tile.
Backer Board & Niches — Cement backer board hung and the two stacked niches framed in, before waterproofing and tile.
Backer Board & NichesCement backer board hung and the two stacked niches framed in, before waterproofing and tile.
The Same Bathroom, Finished — Marble-look tile carried through the shower, the niches, the tub surround and the window ledge.
The Same Bathroom, FinishedMarble-look tile carried through the shower, the niches, the tub surround and the window ledge.
Framing & Rough-In — Shower bench and curb framed and plumbing roughed in after the old surround came out.
Framing & Rough-InShower bench and curb framed and plumbing roughed in after the old surround came out.
Full Bathroom Rebuild — New framing and moisture-resistant board going up after demolition.
Full Bathroom RebuildNew framing and moisture-resistant board going up after demolition.

Free estimate

Want work like this at your place?

Answer three quick questions so we can understand your project and get you a real number — not a guess over the phone.

  1. What project are you ready to complete?
    Painting, epoxy flooring or tile — and what area of the home or property needs the work?
  2. When would you like the project started?
    As soon as possible, within 30 days, within 1–3 months, or still planning?
  3. Are you ready to schedule an on-site estimate?
    This helps us prioritize homeowners and businesses actively preparing to move forward.

Or just call (909) 832-9768

We'll text or call you back the same day. No spam, no sales pressure.

Where we work

RedlandsYucaipaLoma LindaRiversideFontanaHighlandSan BernardinoRialtoColtonBeaumontCalimesaMoreno Valley

Get a free estimate this week

Tell us what you're working on and we'll walk the project with you, measure it, and give you a written price at no cost.

Text Us Call Now